
Crane Operation
Topics
• Role play
• Teamwork
• Gross motor skills
Length
4.5 m
Width
4.5 m
At a construction site setting, users can carry out several activities:
• Operating the crane to lift materials up, so the automatic basket moves them to the "construction zone."
• Collecting materials and moving them in wheelbarrows to take them to the unloading zone.
• Placing materials at the unloading zone.
Notes
Design and engineering can be adapted to the requirements of each project.